Automotive Components Smart Manufacturing Solution
High-cycle precision machining and assembly for chassis, brake and powertrain housing components, built to help you pass your OEM's process audit.
What customers actually struggle with
Solutions start from real production problems, not from the machines we happen to build.
Cycle-time pressure
Annual price-downs and order fluctuation coexist. Existing machine utilization stays below 65%, and overtime still cannot guarantee stable delivery.
Process audits are hard to pass
IATF 16949 and OEM audits require CPK ≥ 1.33 on key characteristics, but manual inspection data cannot be traced.
Frequent changeovers
With dozens of part numbers, changeover depends on experienced setters and accounts for over 40% of downtime.
Solution Scope
- High-speed machining island A multi-machine island built from HG-V850 and HG-H630 units with gantry loaders for automatic part handling.
- Flexible manufacturing cell HG-FMS320 handles low-volume, high-mix orders and supports unattended night production.
- In-line inspection loop HG-VIS4 vision inspection plus HG-CMM710 CMM sampling deliver 100% inspection of key dimensions.
- Assembly and traceability HG-ASM12 intelligent assembly line completes sub-assembly, with tightening and press-fit curves archived per part.
- Digital foundation HG-MES and HG-IoT connect order, machine and quality data and produce CPK and OEE reports.
Measurable Customer Benefits
Before-and-after data measured on delivered projects, for reference in your own evaluation.
| Metric | Before | After implementation |
|---|---|---|
| Machine utilization | 62% | 87% |
| Machining cost per part | baseline 100 | 78 (down 22%) |
| Key-characteristic CPK | 1.05 | 1.67 |
| Changeover time | 95 minutes | 18 minutes |
| Traceability granularity | batch level | single-part level |
A brake-system supplier in East China needed to expand caliper-housing capacity and satisfy its OEM's process audit. The solution combined six HG-H630 horizontal machining centers, two HG-FMS320 flexible cells and HG-MES. Five months after go-live, machine utilization rose from 62% to 87%, CPK on the key bore pattern reached 1.67, and the plant passed its customer's VDA 6.3 process audit and won additional nominations.
Equipment in This Solution
Core machines involved in this solution. Select one to view its specifications.
Is this solution right for your line?
Send your current process, part drawings and output target. Our industry engineer will assess feasibility first, then discuss machine configuration.
15087131796